Customization: | Available |
---|---|
After-sales Service: | Online Install Guide/Overseas Commissioning |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Water tank wire drawing machine has heavy water tank and turnover water tank. It is suitable for drawing various metal wires of medium and fine specifications, especially high, medium and low carbon steel wire, galvanized iron wire, bead steel wire, rubber hose steel wire, steel cord, copper wire, aluminum wire, etc.
Water tank type wire drawing machine is a small continuous production equipment composed of multiple drawing heads. Through step-by-step drawing, the drawing head is placed in the water tank, and finally the steel wire is pulled to the required specification. The whole wire drawing process is completely controlled by the mechanical speed difference between the main shaft of the drawing machine and the lower shaft of the drawing machine.
meter
|
2.0-3.0mm
|
Outlet wire diameter
|
0.6-1.0mm
|
Max speed
|
550m/min.
|
Tower wheel material
|
Alloy material
|
Main motor power
|
22kw or as requirement
|
Wire take-up motor power
|
4kw
|
Wire take-up mode
|
Trunk type and metal spool type
|
Control system
|
Frequency conversion control
|
1: What is your gurantee?
A: Main frame for 1 year. But,our machine's quality is very good, and using long life.
2. What is your company normal payment terms?
A: Usually we accept T/T 50% in advance and balance 50% before shipment.
3.What are your company normal export terms?
A: We normal export with CFR, CIF and FOB trade terms.
4.How many days it will take you to produce mass production for us?
A: Normally it takes about 35-40 days, it also depends on the order quantity and production seasons.
5. Are your engineers can go abroad to install machine?
A: Yes, our engineers available to severvice machinery oversea and train worker.